July 2023 Tiffin Elementary: Concrete work is complete, equipment is installed, and safety surface is being installed.
July 2023 Clear Creek Elementary: Work has been done for removal of mulch and rough grading back with rock. The finish grade and safety surface should be starting towards the end of July.